Prepared industrial area
Classification: Light industry and logistics
Access to the highway: 11 km
Electricity: Yes
Water: Yes
Sewage: Yes
Gas: Yes (STL)
Connections: Built
Technical infrastructure
- Complete utility network + intra-campus communication + sidewalks + public lighting
Development fees
The project is exempt from the obligation to pay a fee
Territory parameters
Area: 130,000 m2 (13 ha), divided into 3 plots. Each plot has its own separate connection points to utility networks that are built.
Plot No. 1: approx. 45,000 m2
Plot no. 2: approx. 42,500 m2
Plot no. 3: approx. 42,500 m2
Possibility to build: 3 halls (approx. 19,000 m2 on each of the plots)
The plots can also be sold separately.
The advantages of the project
- readiness for immediate construction, price, proximity to the capital, excellent transport accessibility, technical infrastructure and intra-campus communication at the border of the plot.

CONTACT THE OWNER
Feel free to contact the project owner with your questions.